Waverley Brownall

Our philosophy is dominated by quality.

  • Home
  • Tube Fittings
    • Ringlok Fittings
    • Duoloc Fittings
    • Stainless Steel Tube
    • Gas Release Flaps
    • Flange Fittings
  • Ball Valves
    • BV 1000 Series Ball Valves
    • 3 Way Ball Valves
    • BV 3000, 6000 Ball Valves
    • PSV8 Ball Valves & Needle Valves
    • Lockable Handle Ball Valves
    • Air Actuated Ball Valves
    • Cast 316 Ball Valves
  • Valves
    • Stainless Steel Needle Valves
    • Check Valves
    • Relief Valves
    • Strainers
    • Manifold Valves
    • Double Block & Bleed Valves
  • Pipe Fittings
    • Hose Components & Unions
    • Plugs, Bushes & Seals
    • High Pressure Precision Pipe Fittings
    • Low Pressure Cast Range of Pipe Fittings
  • Special Metals
    • Titanium
    • 6 Mo Stainless Steel
    • Monel 400
    • Inconel 625
    • Incoloy 825
    • Hastelloy C-276
  • Catalogues
  • About
    • Blog
    • Bespoke Solutions
    • Approvals
    • Case Studies
    • Quality
    • Support
    • Terms & Conditions
  • Contact Us

October 24, 2016 By Waverley Brownall

Hinkley Point C Nuclear Power Station In Somerset Approved

Hinkley Point C Nuclear Power Station In Somerset Approved

The Hinkley Point C Power Station (HPC) project has now been approved

by the UK government for construction in the South West of England, Somerset. This £18bn nuclear power station will be financed by the French and Chinese governments.

Business and Energy Secretary, Greg Clark, stated to the House of Commons that measures will ensure that foreign investment in the UK’s infrastructure will work “in the country’s best interests.”

Hinkley C – For and Against

After a month of uncertainty from the public and several delays, this approval is step one in a long process before the nuclear project is fully underway.

Opposing opinions have been brewing in Somerset, with county council spokesmen ensuring the positive influence of job creation, meanwhile Greenpeace state that an investment in renewable energy would be much more reliable.

Oppositions from French trade unions also appeared when concerns over Areva’s EPR reactor grew.

The EPR reactor is the type to be used at Hinkley Point C, but its complex design has caused severe delays and has seen the costings stretched to three times over the original budget.

EDF’s Video – Meet The People Living and Working at Hinkley Point C

Construction will provide roughly 25,000 jobs. At the peak of the project build, 5,600 people will be working at the site.

85% French state owned energy giant EDF will lead the project, with China’s CGN taking a 33.5% stake in Hinkley Point C. CGN will be required to fund a third of the £18bn price tag.

It is approximated that Hinkley could be generating electricity for the UK market by 2025.

Helpful links:

  • ​EDF Energy – Nuclear Project Hinkley C
  • Hinkley Point C Nuclear Power Plant – Wikipedia
  • Ministers Sign Go-Ahead For Nuclear Power Plant – The Guardian

Filed Under: Uncategorized Tagged With: energy news, hinkley point c, news, nuclear power

  • Duoloc Imperial & Metric Charts
  • Ringlok Imperial & Metric Charts

Call us or email us on:
+44(0)1702 600014
enquiries@waverleybrownall.co.uk

Additional Links

  • Approvals
  • Catalogues
  • Case Studies
  • Quality
  • Support

Copyright © 2026 · ·Generate Pro Theme on Genesis Framework · WordPress · Log in

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.