Waverley Brownall

Our philosophy is dominated by quality.

  • Home
  • Tube Fittings
    • Ringlok Fittings
    • Duoloc Fittings
    • Stainless Steel Tube
    • Gas Release Flaps
    • Flange Fittings
  • Ball Valves
    • BV 1000 Series Ball Valves
    • 3 Way Ball Valves
    • BV 3000, 6000 Ball Valves
    • PSV8 Ball Valves & Needle Valves
    • Lockable Handle Ball Valves
    • Air Actuated Ball Valves
    • Cast 316 Ball Valves
  • Valves
    • Stainless Steel Needle Valves
    • Check Valves
    • Relief Valves
    • Strainers
    • Manifold Valves
    • Double Block & Bleed Valves
  • Pipe Fittings
    • Hose Components & Unions
    • Plugs, Bushes & Seals
    • High Pressure Precision Pipe Fittings
    • Low Pressure Cast Range of Pipe Fittings
  • Special Metals
    • Titanium
    • 6 Mo Stainless Steel
    • Monel 400
    • Inconel 625
    • Incoloy 825
    • Hastelloy C-276
  • Catalogues
  • About
    • Blog
    • Bespoke Solutions
    • Approvals
    • Case Studies
    • Quality
    • Support
    • Terms & Conditions
  • Contact Us

October 18, 2016 By Waverley Brownall

The Armada Gas Field – Development And Supply

Waverley Brownall is proud to be the approved supplier to this offshore project that produces an est. 26,000 barrels per day.

The Armada gas field installation is located 244km to the east of Aberdeen in the central North Sea. The gas fields are named after British sailors who fought in the Spanish Armada (1588).

oil rig armada

Platforms

  • Fleming (Palaeocene Maureen Formation, 6 extended reach wells)
  • Drake (Jurassic Ula Formation, two wells)
  • Seymour (Jurassic reservoir, single well)
  •  Hawkins (Jurassic sandstone, single sub-sea well)

The £430 million armada development (originally, budget of £537) has a peak gas production of 450 million standard cubic feet per day. (Ref: 1.1 of the BG Environmental Report)

Gas

armada gas field export routes

The Central Area Transmission System (CATS Pipeline) is where the natural gas from the Armada field is transported. Based in Teeside in the North East of England, this processing system serves over 30 fields in the UK through 250 miles of pipeline.

The C.A.T.S transmission system has a record of outstanding safety since commission in 1993.

Oil

The oil produced from Armada is transported via the FPS Forties Pipeline System which has a capacity of over 1 million barrels per day. View the FPS catchment area.

Involvement

Project founders: Operator BG Exploration and Production, Amoco, Fina, Phillips UK, Yorkshire Electricity and Agip UK.

Project partners (to date 2016): BG Group, Centrica, Total S.A

Related Posts

25mm Compression Fittings in 316 Stainless Steel

Read More
60° Hose Fittings, BSP Thread Up To 3000 psi

Read More
Precision Pipe Fittings Up To 6000 PSI

Read More
Where Will Your Tube Fittings Be 5 Years From Now?

Read More
Pipe Threads Explained In 5 Steps

Read More
Tube Fittings Material Selection

Read More

Filed Under: Uncategorized Tagged With: bespoke solutions, projects

  • Duoloc Imperial & Metric Charts
  • Ringlok Imperial & Metric Charts

Call us or email us on:
+44(0)1702 600014
enquiries@waverleybrownall.co.uk

Additional Links

  • Approvals
  • Catalogues
  • Case Studies
  • Quality
  • Support

Copyright © 2026 · ·Generate Pro Theme on Genesis Framework · WordPress · Log in

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.